News
Anhui purification project is divided into biological clean room and non-biological clean room.

Anhui purification projects are divided into biological clean rooms and non-biological clean rooms. The dust particle counter is used to detect dust particles and buffer for 0.5 to 1 hour after environmental sanitation cleaning. In order to avoid man-made pollution, the purification workshop is limited to two people for static tests. The return air pipe of the purification workshop of the electronics factory is made of hot cross zinc plate, and the stainless steel frame is pasted with flame-retardant PF foam plastic plate, which has a good purification and heat preservation effect. The stainless steel frame is used for efficient air outlet, which is beautiful and clean. plate. The ground of Anhui purification project can use epoxy self-flow grade wear-resistant plastic floor. If you have anti-static requirements, you can choose anti-static type.
Anhui purification projects are divided into biological clean rooms and non-biological clean rooms
Control the content of Micro-Organism. Controlling the microbial content in the purification workshop environment still relies on good air purification system facilities, and its filtration efficiency can reach 99.9%~99.99%, which can filter out special structures in the air: capsule, flagella, bacterial (fungus) hair and dust . In the production process, the temperature of the purification workshop is strictly controlled at 18~26℃, and the relative humidity is controlled at 45%~65%, which destroys the conditions conducive to bacterial growth.
Anhui Purification Project As for the disinfection of daily disinfectants, use 75% ethanol (alcohol) or 2‰ of Xinjieermin solution to "wipe" machines, desktops, doors and windows, walls, etc. after production every day. , wipe the ground with 3%~5% Lysol. The return air duct of the purification workshop of the electronics factory is made of hot-dip zinc plate, and the stainless steel frame is pasted with flame-retardant PF foam plastic board, which has good purification and heat preservation effect. plate. The floor can be epoxy self-leveling floor or super wear-resistant plastic floor. If you have anti-static requirements, you can choose anti-static type. After every 3 days of production, wipe and disinfect the surfaces, ceilings, lighting and other surfaces of all the facilities in the purification workshop with 75% ethanol or 2‰ of Xinjieermin solution. Special structures produced: capsule, flagella, fungus
These measures (referring to the method of solving the problem) can only control the special structures in the air of the purification workshop: capsule, flagella, bacteria (fungus) and miscellaneous bacteria. If there are a lot of molds, it is necessary to spray 5% carbonic (C) acid indoors, and then fumigate with formaldehyde to achieve the effect of sterility (ie: no viable bacteria). Only in this way can bacteria and miscellaneous bacteria be killed. The mandatory standard of GMP purification workshop and other industries requires enterprises to meet the hygienic quality requirements in terms of raw materials, personnel, facilities and equipment, production technology, packaging and transportation, quality control, etc. in accordance with relevant national laws and regulations, and form a set of operable operating specifications. Help enterprises to improve the sanitation environment, timely find problems in the production process and improve them. At the end of each production cycle, the clean room requested in the next cycle should be sterilized before the production of the next cycle. After the number of dust particles in the clean room meets the regulations, the formaldehyde gas in the purification workshop is fumigated. From the long-term test results, this environmental sterilization method has played a very good role.
It has developed in the field of GMP biopharmaceutical purification for many years, and has implemented a series of GMP workshop purification projects. Through the construction team of purification workshops with strong technical strength and well-trained, some difficult projects have been completed perfectly.